June 2012 Dell EqualLogic Configuration Guide v13.2 12
In a redundant switch SAN configuration, to optimize the system response in the event you have a
vertical port failover you must split the vertical port pair connections between both SAN switches.
The connection paths illustrated in Figure 6 and Figure 7 show how to alternate the port connection
paths between the two controllers. Also note how IP addresses are assigned to vertical port pairs.
Figure 6 PS4100 Vertical Port Failover and Optimal Connection Paths
IMPORTANT: By alternating switch connection paths between ports in a vertical port pair, port
failover allows the array to maintain 100% bandwidth capability in the event of a switch failure.
Comments to this Manuals