2-21
Cisco Catalyst Blade Switch 3130 for Dell and Cisco Catalyst Blade Switch 3032 for Dell Hardware Installation Guide
OL-13269-01
Chapter 2 Switch Installation
Installing Devices in the 10-Gigabit Ethernet Slots
Connecting the StackWise Plus Cables
Follow these steps to connect the StackWise Plus cables:
Step 1 Remove the dust covers from the StackWise Plus cables, and store them for future use.
Step 2 Verify that cables are aligned as shown in Figure 2-11.
Figure 2-11 Inserting the StackWise Plus Cable
Step 3 Insert one end of the cable into the StackWise Plus port on the front panel of the switch. Insert the other
end of the cable into the connector on the other switch (see
Figure 2-11).
Always use a Cisco-approved StackWise Plus cable to connect the switches.
When you remove the StackWise Plus cables from the connectors, replace the dust covers to protect them
from dust.
Caution Removing and installing the StackWise Plus cable can shorten its useful life. Do not remove and insert
the cable more often than is absolutely necessary.
Installing Devices in the 10-Gigabit Ethernet Slots
These sections describe how to install and remove X2 transceiver modules, Cisco TwinGig Converter
Modules (also known as converter modules), and SFP modules:
Installing X2 Transceiver Modules and Cisco Converter Modules, page 2-22
Installing SFP Modules, page 2-25
Caution Do not remove the dust plugs from the fiber-optic X2 transceiver modules or SFP modules or the rubber
caps from the fiber-optic cable until you are ready to connect the cable. The plugs and caps protect the
module ports and cables from contamination and ambient light.