Dell POWEREDGE 300 User Manual Page 32

  • Download
  • Add to my manuals
  • Print
  • Page
    / 202
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 31
30 Two-Post Rack Installation
Installation Tasks
Installing a two-post rack kit includes performing the following tasks in order:
1
Marking the rack
Universal-hole spacing rack
Wide-hole spacing rack
2
Installing the mounting rails in the rack
Center-mount installation
Flush-mount installation
3
Installing the system in the rack
4
Routing cables
Marking the Rack
You must allow 1 U (44 mm, or 1.75 inch) of vertical space for each system that you install in the two-post
rack.
Universal-Hole Spacing Racks
Racks with universal-hole spacing have an alternating pattern of three holes per rack unit with center-to-
center hole spacing (beginning at the top hole of a 1-U space) of 15.9 mm, 15.9 mm, and 12.7 mm
(0.625 inch, 0.625 inch, and 0.5 inch) for the front and back vertical column of holes (see Figure 2-2).
Figure 2-2. Two-Post, Open-Frame Relay Rack Universal-Hole Spacing
12.7 mm (0.5 inch)
15.9 mm (0.625 inch)
15.9 mm (0.625 inch)
1 U (44 mm or 1.75 inches)
Page view 31
1 2 ... 27 28 29 30 31 32 33 34 35 36 37 ... 201 202

Comments to this Manuals

No comments