Dell PowerConnect M6220 User Manual Page 13

  • Download
  • Add to my manuals
  • Print
  • Page
    / 16
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 12
X-Series Appliance Switch Configuration for v7.8.4 11
Configuring link aggregation
In link aggregation, both ports are active and share the load. If one port fails, the
remaining port assumes all of the load.
Requirement: The upstream connections must be on the same switch or to switches
in the same stack.
To configure link aggregation on the A1 or A2 switch:
1. Ensure that both Te1/2/1 and Te1/2/2 are enabled.
2. Perform these commands in console mode:
interface Te1/2/1
duplex full
channel-group 1 mode active
switchport access vlan 1
exit
!
interface Te1/2/2
duplex full
channel-group 1 mode active
switchport access vlan 1
exit
!
interface port-channel 1
switchport access vlan 1
exit
3. On the upstream switch:
a. Enable the 10 gigabit ports.
b. Configure link aggregation. See your switch documentation.
c. Configure each according to your VLAN allocation:
switchport access vlan <n>
Some older switches require that the VLAN info be configured on both the
physical ports and the link-aggregation port.
Some newer switches require VLAN configuration on link-aggregation port
only.
Page view 12
1 2 ... 8 9 10 11 12 13 14 15 16

Comments to this Manuals

No comments