2-Post Rack Installation 1-15
Figure 1-9. Routing the Power Cords
CAUTION: Allow some slack in each cable as you route them around hinges in the
cable-management arm.
Routing Cables
1 Attach the I/O cable connectors to their respective connectors on the system back
panel.
For details on cable connections, see your system’s Installation and Troubleshooting
Guide and the User’s Guide.
2 Route the power and I/O cables through the cable-management arm, using four
loosely secured tie-wraps (two in the middle and one on each end of the cable-
management arm). Do not fully tighten the tie-wraps at this time (see Figure 1-10).
Allow some cable slack in the cable-management arm to prevent damage to the cables.
3 Secure the cables to the cable-management arm:
a After connecting the cables to the system, unscrew the thumbscrews that secure
the front of the system to the front vertical rail.
b Slide the system forward to the fully extended position.
c Route the cables along the cable-management arm, make any adjustments
needed to the cable slack at the hinge positions, secure the cables to the cable-
management arm with the tie-wraps, and close the wire covers over the
cable-management arm.
power cord plug
power receptacle housing