24 Four-Post Rack Installation
Routing Cables
1
Open the wire cable basket lid on the top of the cable-management arm
, to
enable cables to be routed
within the arms (see Figure 1-14).
Figure 1-14. Routing Cables on the Cable-Management Arm
2
If applicable, connect the system status-indicator cable to its connector on the system back panel.
Route the system status-indicator cable through the cable-management arm and insert the LED end
into the slot on the end of the cable-management arm.
3
Attach the I/O cable connectors and power cable connectors to their respective connectors on the
system back panel.
For details on cable connections, see your system’s
Getting Started Guide
or
Hardware Owner’s
Manual
.
NOTE: Use the strain-relief loops on the back of the power supplies to provide strain relief for the power
cables.
4
Using the tie-wraps provided in the rack kit, bundle the cables together so that they do not interfere
with adjacent systems in the rack.
1 cable-management arm 2 preinstalled tie wraps 3 cable-management arm
retention latch
4 basket lid 5 system status-indicator
cable connector
6 Velcro strap
7 preinstalled tie wraps
4
5
2
3
6
back of system